Removal and Installation of Slat wiring systems modifications (avionics only)
Continuity and ring outs
Operational tests to be completed mutually between AMES and Launch if power is available and aircraft is operational within 24 hours of the completion of installation.
Any System Software Loading and Systems Test Operation, which will be completed mutually between AMES and Launch